Somes Sound - Midpoint of build?

Been busy lately on the internal fit out and getting to the stage where my boat is beginning to take shape. Some days I seem to make great progress, others you spend hours seemingly getting nowhere.

What does seem surprising is the amount of wood I still have left over - yet there doesn't seem to be that much more construction to be done.   Initially, I spent a good deal of time calculating the timber requirements, as I had to import it from the UK and didn't want to rack up unnecessary shipping fees by buying all at once.  I have lots of Sapele mahogany left over  - so maybe anther boat is on the horizon!

My next major step is to remove the decks which are dry fitted and seal the planking with epoxy, then turn the hull and finish the outside of the hull.  I'm thinking I will put on the primer coats and perhaps one top coat.  Also considering fitting the lead keel: drilling for the bolts and doing the final fairing, then removing it before right siding the hull again.

 I resawed a 45mm x 208mm Sapele board for the side decking.  Although the side deck is only about 2 1/2" wide, the curve on the hull demands quite a wide piece of stock to fit the curve.  By the time I resawed the 45mm board and planed it through the thicknesser, I ended up with only 3 slices of 12mm thick Sapele - plenty for what I needed, but nonetheless, 9mm lost in machining!  I debated on using some of the Sapele ply as it is such a good quality ply, but the rotary saw pattern isn't quite so authentic at the real board.

I experimented with some different bandsaw blades - trying a 1" blade which came with the saw (secondhand, but new spare blades)  The 1" blade was complete rubbish - smoke and squealing, so I switched for a new 1/2" blade I bought last year and the difference was night and day...




I also managed to rope in my friend Brendan to do another lead
smelt.  We fired up our old lead smelter, and poured about 20lbs of lead into the centreboard.  It went reasonably smoothly with no drama and the off cuts and left over scrap I had from the original keel or and now consolidated into nice shiny ingots...Thanks Bren!

I have to figure out the best way to carry the 16mm bronze rod which is used as a pivot pin for the centreboard.  I'm wondering if a piece of copper tube will suffice.




I have yet to make up Sapele trim for the lockers and shape up the hull rails, but I do think I have reached the  halfway stage of the build.

I am in the process of placing an order with Ballentine Boats in Cataumet, MA.  They are great people to deal with - very helpful and responsive.  Bronze hardware is very expensive so it's good to deal with people who are so genuinely helpful.  Thanks Tyler!

Here's a picture of the parts which should be coming my way soon:



Read More..

Front deck and side lockers

Making some progress on the decks and side lockers.  Using John
Brooks advice in specifications, I used a sheet of fabric to measure out the deck.  I managed - just to get both sides of of one 8 x 4 sheet of 3/8" ply.  In doing so, I had to shorten the side deck panel by about 1", which will simply mean that the Sapele solid deck will need to come forward by an extra 1" - no issue there.

While I used the manufacturers straight edge, when I cam to laying the two sides on the deck, for some reason which I haven't been able to establish, they did not site together seamlessly, so I had to plane a little off to get a better fit.  I don't imagine it will be a problem, as the deck will be covered in Dynel and epoxy, so a gap of 1 mm should get filled up quite easily.
I dry fitted the deck with 8 by 1" bronze screws.  I must have used 50 or 60 screws in the process - 2 of which broke in the deck beams, despite setting the torque on th electrc screw driver at a low setting.

Here you can see the deck before it was screwed to the beams and the edges cleaned off with a flush trim router cutter.

Next I moved onto shaping and fitting the side lockers.  John Brooks provides a full sized pattern in his plans for one of the locker sides.  So I made a template from this and used this to spile an exact copy for all four sides of the lockers.  However, this caused some head scratching, as the locker sides are fitted at stations 8 & 10 and these have slightly different hull profiles.  This resulted in the locker sides running out of alignment, so I had to do quite a bit of refining.  The next picture shows how the aft locker side is higher than the front, which would have cased the seat to run off level, unless lines to the aft bulkhead were checked.  Sounds obvious, but anytime I have deviated from John's plans I have subsequently found this to be at my cost...hopefully I have it right this time.  Once again a quick email response from John satisfied my doubts.

Next I started to create the V notches in the side locker panel.  Based on a suggestion over on the BuildingGlued LapStrake Yahoo groups of using a jig on the router base, I made a simple base with a plastic strip guide.  This worked quite well, though with some refinement could be better...ideally longer.

 Here you can see the base of the jig attached to a small router and the
resulting grooves cut into the side panel.



Read More..

Internal Fit Out - continued...

My next step was to build the aft bulkhead and install the aft deck beams.
The plans call for 3/8" ply (I'm using Robins Elite Sapele) which can be fitted either as one component or two halves.  I elected to fit as a single component and so had to first scribe a vertical line on the inside of the hull where the bulkhead was to be positioned.
I spent considerable time with a laser beam with limited success so I ended up using straight edges clamped to a spirit level amidships, having first checked and rechecked that the hull was sitting level fore & aft and bow to stern.

Using a joggle stick which I clamped vertical on the hull, I drew point on the spiling board at each plank land which I then transferred onto the plywood to cut out the bulkhead shape.  This proved quite successful although I needed two different joggle sticks to account for the longer lengths.

Having cut out a template and satisfied myself to the final measurements, I transferred the measurements onto the final stock.

 I then routed lines into the panel to imitate the paneling effect.  I used a simple jig to space out the lines but on one run managed to misaligned the jig so I ended up having to fill the errant line with epoxy---shouldn't matter as this panel is to be painted.

I also brushed neat epoxy into the routed cuts to seal the ply.  It fitted well into the hull requiring only small fillets of epoxy to make for a sturdy joint.

So far so good.

Next stage was to make the doors and fittings for the bulkhead which John Brooks advises to do before fitting the bulkhead.  The plans call for the fitting to be looser than what you would allow for normal cabinet building...Hah - not ever having built a cabinet before, I reckoned that making them looser would most likely be the outcome!

The profile of the trim called for quite a complex Z shape, which was to be repeated for the side lockers, so I elected to make all three at once.

Here you can see the Sapele being shaped mainly on the table saw and then router.  I was quite pleased with the result.  Next came to jointing the pieces which was quite time consuming but enjoyable work.  The lower edge required a different profile with a small angled sill.

I decided to use TiteBond 3 to glue up the joints as they seemed to fit quite snugly and are not structural...plus I want to varnish these pieces so the TiteBond glue line should be less visible than epoxy.

Next step was to make the doors which also are encased in a Sapele frame, using half lap joints,  This worked out quite nicely and I think it looks the part.  When I first saw the Somes Sound in John's workshop, I was unsure if I could make such intricate (at least to my eyes) components, so I derived great satisfaction in getting them made.

Once I had all three frames and doors made, I installed the rear bulkhead.  This time I used tape to form a neat fillet of epoxy.  I'm not sure I would do this again, as the tape was quite difficult to remove later when the epoxy had set.  Perhaps I should have pulled the tape once I was finished laying the epoxy and before it hardened.


Once the aft bulkhead was installed, this gave me the reference height to fix the transom cleats for the aft deck.  I was unsure as to how these cleats should be fitted, and a quick email to John Brooks elicited a very swift and concise response (Thanks John!) where he described how to make and use a declination level, whereby the level is fixed to a batton and raised at one end to allow for the correct fall from the aft end of the deck towards the bulkhead, so ensuring that water is not left lying on the deck.  Also the deck has a camber to the sides to promote a dry deck and fair lines.

 The camber of the bulkhead is repeated in the deck beams and also the transom cleat.  I made a template of the camber which ensured that all decking components were identical.

Additionally there are two curved cleats attached to the hull between the bulkhead and the transom.
 Initially I misread the plans and so made them such that they lay to the same level as the top of the transom cleats on one end and to the top of the bulkhead at the other.  Then on closer inspection of the plans and building instructions, I realized that these side cleats need to be lower down so that when the deck is attached, there is a gap between the deck and the hull so that water can drain down each side and to a limber hole aft of the bulkhead.

This is a very thoughtful detail, as it ensures that any water draining off the deck is carried away unsighted behind the bulkhead and into the bilge through two further limber holes at the bottom of the bulkhead, leaving the exposed surfaces of the deck and bulkhead unblemished by water marks.  The more I get into building this boat, the more I am impressed with the attention to detail that John Brooks has engineered in his design.


Here you can see there the aft deck beams sit on top of the side cleats to ensure that the deck is fitted with a gap from the hull.

The plans call for quarter knees to be fitted to the hull and transom, but it is not clear to be how they should be designed - as the drawings do not look as if  conventional knees are fitted on a horizontal plane between the transom and the side deck filler, rather sitting on a vertical pace between the transom cleat and the hull.  I'll have to ruminate on these a bit more before deciding on how to proceed...unless any other SS builders out there can comment?

Next stage is to build the side lockers which provide support for the side seating.  I have already made the doors and frames and a template for the sides of the locker, so it shouldn't be too long before that's accomplished.  However we're heading off for a trip to Budapest to visit my daughter who is attending university there, so the building will have to wait until my return.

More later....Please feel free to comment with advise, critiques or suggestions.







Read More..



Blog Archive

Diberdayakan oleh Blogger.